Marjol Battery Site
 
Home

Site Background

Summary of Corrective Measures Implementation (CMI) Process

Post-Construction  Maintenance and Monitoring

Construction  Information (May 2008 to August 2010)

Final (100%) Remedial Design

Air Monitoring

Stormwater Management System

Photo Gallery

Quarterly Progress Reports and CMI Completion Report 

Community Relations

Documents

FAQs

Contact Us

Web Site Map

Turbidity Information Available for Monday, August 2, 2010

Discharge from the sedimentation basin was initiated at 7:30 am based on visual observations of the water in the sedimentation basin. The observations clearly showed a reduction in turbidity in the basin and clear water was observed to at least a 1-2 foot depth. Discharge was permitted to continue after a reading of 48.3 NTUs was collected at the discharge pipe. Six turbidity readings were collected at the discharge point throughout the morning with results all well below the turbidity standard (highest result was 53.9 NTUs). The monthly discharge sample for August for total and dissolved lead analysis was collected at 11:20 am. The turbidity at the time of sample collection was 6.36 NTUs. Dissolved lead was not detected at a detection limit of 1 ug/L.  The NPDES permit standard for maximum dissolved lead for the Site is 650 ug/L. Total lead was also not detected at a detection limit of 1 ug/L. There is not an NPDES standard for total lead.  These results confirm that the turbidity performance standard is protective against a release of lead into the Lackawanna River.  
 

(Click here to go back to the August 2010 stormwater calendar page.)

 

Page Last Modified Wednesday January 12, 2011 02:11:54 PM

 

 

 

 

 

 

 

 

 

 

tel 570.383.9313 | email layers@advancedgeoservices.com

Send mail to
agc@advancedgeoservices.com with questions or comments about this web site.
Copyright © 2006 Advanced GeoServices