Marjol Battery Site
Major Milestone Reached – Remedy Construction is Complete! For more information, see the Construction Schedule and Information page of the web site.
 
Home

Site Background

Summary of Corrective Measures Implementation (CMI) Process

Construction Schedule and Information

Final (100%) Remedial Design

Air Data

Stormwater Management System

Photo Gallery

Quarterly Progress Reports & Monitoring

Community Relations

Documents

FAQs

Contact Us

Web Site Map

Air Data Available for Tuesday, August 11, 2009

  • Real-Time air monitoring (Near Field Zone monitoring) - this type of air monitoring will determine if dust is migrating outside of the immediate work area so that additional dust control measures can be implemented before any dust can move off-site. This monitoring will consist of continuous, real-time dust monitoring upwind and downwind of the work zone during all phases of work with potential for significant release of dust (i.e., during soil excavation, backfill, waste placement, and cap installation.)  Real-Time monitoring provides immediate information on the amount of dust (not just lead) being generated.

Note: Air Monitor 4 had an hourly average reading recorded that was above the Action Level for the area it was in during working hours on August 11, 2009.  The co-located (PAM) lead samples from the Air Monitor 4 location was sent in for analysis.  (See the Co-Located Lead Samples information below for the result of this analysis.)  Click on the links below to view graphs showing the real-time air monitoring data for August 11, 2009:    

                                       Working Hours                         Non-Working Hours       

 

  • Co-Located Lead Samples - this type of air monitoring consists of air monitoring for lead using personal air monitors (PAMs).  For this monitoring, the PAMs are placed at the same location as the Real-Time (Dust) Air Monitors or along the perimeter fenceline.  This sampling is in addition to what is required by the 100% Design.  The samples are analyzed by a method that provides a detection limit similar to the detection level that is used for the perimeter high volume air samplers. This allows us to compare the co-located sample results with the results that we obtain every six days from the perimeter high volume air samplers. The co-located samples are also helpful in providing data when exceedances occur at one of the dust monitors.

The real-time dust monitors are moved around on a daily basis based on the location of work activities for the day; the co-located samples are located with the dust monitors each day.  Click below to view data for August 11, 2009,

Working Hours   

(Click here to go back to the August 2009 calendar page.)

 

 

 

 

                

                 

 

 

 

 

 

 

Page Last Modified Tuesday March 02, 2010 02:45:28 PM

 

 

 

 

 

 

 

 

 

 

502 George Street | Throop, PA 18512 | tel 570.383.9313 | fax 570.383.9309 | email layers@advancedgeoservices.com

Send mail to
agc@advancedgeoservices.com with questions or comments about this web site.
Copyright © 2006 Advanced GeoServices