Marjol Battery Site
 
Home

Site Background

Summary of Corrective Measures Implementation (CMI) Process

Post-Construction  Maintenance and Monitoring

Construction  Information (May 2008 to August 2010)

Final (100%) Remedial Design

Air Monitoring

Stormwater Management System

Photo Gallery

Quarterly Progress Reports and CMI Completion Report 

Community Relations

Documents

FAQs

Contact Us

Web Site Map

Air Data Available for Monday, August 23, 2010

  • Site Perimeter Monitoring - this kind of air monitoring consists of ambient air monitoring for lead using the high-volume sampler method, which is what has been used for the past 20 years at the Site. This sampling will determine if air lead is being emitted from the Site. Results with this type of monitoring are not immediate as the air collection filters have to be sent to a lab for analysis.  The sampler draws air over a filter and then the filter is analyzed for lead content. The volume of air that is drawn in is also recorded which gives us the results of micrograms (µg) of lead in cubic meters (m3) of air.   (Click here for a drawing showing the locations of the high volume air samplers.)

24-hour Ambient Air Monitoring Results - results from August 23, 2010     

                

(Click here to go to the August 2010 calendar page.)

 

 

 

 

 

 

                

                 

 

 

 

 

 

 

Page Last Modified Wednesday January 12, 2011 02:11:59 PM

 

 

 

 

 

 

 

 

 

 

tel 570.383.9313 | email layers@advancedgeoservices.com

Send mail to
agc@advancedgeoservices.com with questions or comments about this web site.
Copyright © 2006 Advanced GeoServices