A turbidity reading was collected at the off-site discharge point on
August 24, 2010 at 6:55 am. The turbidity result was 228 NTUs.
Based on the turbidity result, the skimmer was rotated to discontinue
discharge and flocculant material (Pond Clear) was added to the
sedimentation basin to assist with settling out the sediments from the
basin.