Turbidity Information Available for Thursday, August 26, 2010

  • The skimmer was turned to the discharge position. 

  • A turbidity reading was collected at the off-site discharge point on August 26, 2010 at 11:00 am.  The turbidity result was 186 NTUs.

 

(Click here to go back to the August 2010 stormwater calendar page.)

 