Marjol Battery Site
 
Home

Site Background

Summary of Corrective Measures Implementation (CMI) Process

Post-Construction  Maintenance and Monitoring

Construction  Information (May 2008 to August 2010)

Final (100%) Remedial Design

Air Monitoring

Stormwater Management System

Photo Gallery

Quarterly Progress Reports and CMI Completion Report 

Community Relations

Documents

FAQs

Contact Us

Web Site Map

Co-located Lead Samples September 2008 

  • Co-Located Lead Samples - this type of air monitoring consists of air monitoring for lead using personal air monitors (PAMs).  For this monitoring, the PAMs were placed at the same location as the Real-Time (Dust) Air Monitors.  This sampling is in addition to what is required by the 100% Design.  The samples were analyzed by a method that provides a detection limit similar to the detection level that is used for the perimeter high volume air samplers. This will allow us to compare the co-located sample results with the results that we obtain every six days from the perimeter high volume air samplers. Initially, we will use the data from the co-located samples to compare with the information being obtained from the dust monitors and as we move forward, the co-located samples will be helpful in providing data in the event that a future exceedance occurs at one of the dust monitors.

The real-time dust monitors are moved around on a daily basis based on the location of work activities for the day; the co-located samples are located with the dust monitors each day.   

Click below to view data for September 2008:

 

            September 17, 2008                 Week of September 22, 2008                 Week of September 29, 2008

 

Page Last Modified Tuesday March 02, 2010 02:45:47 PM

 

 

 

 

 

 

 

 

 

 

tel 570.383.9313 | email layers@advancedgeoservices.com

Send mail to
agc@advancedgeoservices.com with questions or comments about this web site.
Copyright © 2006 Advanced GeoServices