Daily Stormwater Management Information – March 2010

Click on the shaded dates (the numbers) below to view turbidity data, stormwater discharge data and XRF sediment testing data available for those days. (Note: Turbidity data is only collected on working days when the basin is discharging or following an overflow of the Containment Area. Collection of samples of stormwater discharge for laboratory analysis is required monthly and has also been performed when overflows or turbid discharges have occurred.) No testing was performed, and therefore no data is available for the dates that are not shaded. 

                    = Dates when turbidity readings were taken and the turbidity result was at or below the Performance Standard of 250 NTUS.

= Dates when turbidity readings were taken and the turbidity result was above the Performance Standard of 250 NTUS. 

 

 
March 2010
S M T W T F S
 
1 2 3
4
5
6
7
8 Monthly discharge water samples collected 
15 16 18 19 20
21 22 23 24 25 26 27
28 29 30  31        
                                                                     February 2010                                                                  April 2010

 

(Click here to go back to the Stormwater Management System page.)

 

  

Page Last Modified Wednesday October 20, 2010 09:49:48 AM

 

 

 

 

 

 

 

 

 

 