Air Data
Available for Friday, December 4, 2009
- Co-located (PAM) Lead Samples -
this
type of air monitoring consists of air monitoring for lead using
personal air monitors (PAMs). For this monitoring, until
November 13, 2009, the PAMs were
placed at the same location as the Real-Time (Dust) Air Monitors.
This sampling is in addition to what is required by the 100%
Design. The samples are analyzed by a method that provides a
detection limit similar to the detection level that is used for the
perimeter high volume air samplers. This allows us to compare
the co-located sample results with the results that we obtain every
six days from the perimeter high volume air samplers.
Note: As of Friday, November 13, 2009, excavation of
contaminated fill material was completed and all surface soils at
the Site were below the clean-up standard. Therefore, as
approved by USEPA and PADEP, real-time air monitoring was
stopped as of non-working hours on November 13, 2009.
Co-Located (PAM) Lead Sampling took place on a weekly basis from
the week of November 16, 2009 to December 11, 2009. Site Perimeter sampling continues to be
conducted every six days.
Click below to view data for December 4, 2009,
Working Hours
(Click here to go to the
December 2009 calendar page.)
Page Last Modified
Tuesday March 02, 2010 02:45:47 PM
|