Turbidity Information Available for Monday, January 18, 2010

  • A turbidity reading was collected at the off-site discharge point at 2:40 pm.  The turbidity result was 30 NTUs.  The monthly total and dissolved lead samples were also collected at the off-site discharge point.   The dissolved lead result was 0.16 µg/L.  The NPDES permit standard for maximum dissolved lead for the Site is 650 ug/L.  The total lead result was 9.1 µg/L.  There is not an NPDES standard for total lead.

 

(Click here to go back to the January 2010 stormwater calendar page.)

 

Page Last Modified Tuesday October 19, 2010 01:14:43 PM

 

 

 

 

 

 

 

 

 

 

tel 570.383.9313 | email layers@advancedgeoservices.com

Send mail to
agc@advancedgeoservices.com with questions or comments about this web site.
Copyright © 2006 Advanced GeoServices