Turbidity Information Available for Tuesday, January 26, 2010

SCE repaired the skimmer on January 26, 2010 (Click here for information on the skimmer head breaking away from the skimmer arm on January 25, 2010.). Dewatering through the skimmer resumed once the skimmer was repaired after water in the basin was tested and the turbidity found to be below the performance standard. AGC collected the following turbidity readings on January 26, 2010 to document that the water at the surface of the basin that was being discharged was below the 250 NTU performance standard:

                                        At discharge pipe – 59.9 NTUs
                                        At discharge point from the Site (fence) – 65.1 NTUs
                                        In basin: Range from 35.8 to 84.5 NTUs

(Click here to go back to the January 2010 stormwater calendar page.)

 

Page Last Modified Tuesday March 02, 2010 02:45:54 PM

 

 

 

 

 

 

 

 

 

 

502 George Street | Throop, PA 18512 | tel 570.383.9313 | fax 570.383.9309 | email layers@advancedgeoservices.com

Send mail to
agc@advancedgeoservices.com with questions or comments about this web site.
Copyright © 2006 Advanced GeoServices