Air Data Available for Thursday, July 30, 2009

  • Real-Time air monitoring (Near Field Zone monitoring) - this type of air monitoring will determine if dust is migrating outside of the immediate work area so that additional dust control measures can be implemented before any dust can move off-site. This monitoring will consist of continuous, real-time dust monitoring upwind and downwind of the work zone during all phases of work with potential for significant release of dust (i.e., during soil excavation, backfill, waste placement, and cap installation.)  Real-Time monitoring provides immediate information on the amount of dust (not just lead) being generated.

Note: Air Monitor 3 had two hourly average readings recorded that were above the Action Level for the area it was in (downwind of work activities in the Containment Area) during the morning working hours (9 and 10 a.m.).  It is believed that a water truck or another piece of equipment parked near the air monitor and that may have caused the exceedances.  The co-located (PAM) lead sample from the Air Monitor 3 location was sent in for analysis.  (See the Co-Located Lead Samples section below for the result.)  Click on the links below to view graphs showing the real-time air monitoring data for July 30, 2009:    

                                       Working Hours                         Non-Working Hours       

  • Co-Located Lead Samples - this type of air monitoring consists of air monitoring for lead using personal air monitors (PAMs).  For this monitoring, the PAMs are placed at the same location as the Real-Time (Dust) Air Monitors or along the perimeter fenceline.  This sampling is in addition to what is required by the 100% Design.  The samples are analyzed by a method that provides a detection limit similar to the detection level that is used for the perimeter high volume air samplers. This allows us to compare the co-located sample results with the results that we obtain every six days from the perimeter high volume air samplers. The co-located samples are also helpful in providing data when exceedances occur at one of the dust monitors.

The real-time dust monitors are moved around on a daily basis based on the location of work activities for the day; the co-located samples are located with the dust monitors each day.  Click below to view data for July 30, 2009,

Working Hours                       

 

 

(Click here to go back to the July 2009 calendar page.)

 

 

 

 

                

                 

 

 

 

 

 

 

Page Last Modified Tuesday March 02, 2010 02:45:54 PM

 

 

 

 

 

 

 

 

 

 

tel 570.383.9313 | email layers@advancedgeoservices.com

Send mail to
agc@advancedgeoservices.com with questions or comments about this web site.
Copyright © 2006 Advanced GeoServices