Turbidity Information Available for Friday, July 30, 2010

Geotextile was placed over the skimmer head to act as an additional filter for the water prior to discharge. The skimmer was flipped at 11:25 am. A turbidity reading of 309 NTUs was immediately collected at the discharge pipe (309 NTU) and the discharge was stopped at 11:29 am.  Additional fabric was applied over the skimmer head and discharge was again initiated at 2:40 pm. Three turbidity readings at the discharge pipe were collected (254 NTUs, 274 NTUs, and 281 NTUs). The turbidity at the discharge point was 166 NTUs. Six more turbidity readings were gathered at the discharge point over a span of 25 minutes with an increasing trend toward but not exceeding the performance standard. At 3:20 pm discharge was discontinued after a turbidity reading of 249 NTUs was collected.

USEPA, PADEP, and Throop Borough were kept informed on stormwater management activities during the period from July 19 to August 2, 2010.  A formal non-compliance report covering the period from July 19 to August 2, 2010 was submitted to PADEP on August 4, 2010.  (Click here to review the July 19, 2010 Non-Compliance Report.)

 

(Click here to go back to the July 2010 stormwater calendar page.)

 

Page Last Modified Tuesday October 19, 2010 01:51:37 PM

 

 

 

 

 

 

 

 

 

 

tel 570.383.9313 | email layers@advancedgeoservices.com

Send mail to
agc@advancedgeoservices.com with questions or comments about this web site.
Copyright © 2006 Advanced GeoServices