Turbidity Information Available for Thursday, June 17, 2010

  • Discharge from the basin began at 6:15 am on June 17, 2010.   
  • A turbidity reading was collected at the discharge pipe at 6:20 am.  The turbidity result was 62.9 NTUs.
  • A turbidity reading was collected at the off-site discharge point at 6:45 am.  The turbidity result was 33.9 NTUs.
  • A turbidity reading was collected at the off-site discharge point at 8:38 am.  The turbidity result was 3.15 NTUs.

(Click here to go back to the June 2010 stormwater calendar page.)

 

Page Last Modified Tuesday October 19, 2010 01:38:18 PM

 

 

 

 

 

 

 

 

 

 

tel 570.383.9313 | email layers@advancedgeoservices.com

Send mail to
agc@advancedgeoservices.com with questions or comments about this web site.
Copyright © 2006 Advanced GeoServices