Turbidity Information Available for Monday, March 8, 2010

  • A turbidity reading was collected at the off-site discharge point at 10:20 am.  The turbidity result was 156 NTUs. 
  • The monthly total and dissolved lead samples were also collected at the off-site discharge point on March 8, 2010.   Dissolved lead was not detected at a detection limit of 1 ug/L.  The NPDES permit standard for maximum dissolved lead for the Site is 650 ug/L. The total lead result is 39.6 ug/L. There is not an NPDES standard for total lead.  These results confirm that the turbidity performance standard is protective against a release of lead into the Lackawanna River.  

(Click here to go back to the March 2010 stormwater calendar page.)

 

Page Last Modified Tuesday October 19, 2010 01:26:18 PM

 

 

 

 

 

 

 

 

 

 

tel 570.383.9313 | email layers@advancedgeoservices.com

Send mail to
agc@advancedgeoservices.com with questions or comments about this web site.
Copyright © 2006 Advanced GeoServices