Turbidity Information Available for Tuesday, March 16, 2010

  • The skimmer was lowered back down on March 16, 2010 to allow water from the basin to drain as it is designed to do.
  • A turbidity reading was collected at the off-site discharge point at 11:30 am.  The turbidity result was 124 NTUs. 
  • Two turbidity readings were collected at the off-site discharge point at 11:38 am.  The turbidity results were 71.8 and 73.4 NTUs.
  • A turbidity reading was collected at the off-site discharge point at 3:30 pm.  The turbidity result was 166 NTUs.   

 

(Click here to go back to the March 2010 stormwater calendar page.)

 

Page Last Modified Tuesday October 19, 2010 01:30:43 PM

 

 

 

 

 

 

 

tel 570.383.9313 | email layers@advancedgeoservices.com

Send mail to
agc@advancedgeoservices.com with questions or comments about this web site.
Copyright © 2006 Advanced GeoServices