Marjol Battery Site
 
Home

Site Background

Summary of Corrective Measures Implementation (CMI) Process

Post-Construction  Maintenance and Monitoring

Construction  Information (May 2008 to August 2010)

Final (100%) Remedial Design

Air Monitoring

Stormwater Management System

Photo Gallery

Quarterly Progress Reports and CMI Completion Report 

Community Relations

Documents

FAQs

Contact Us

Web Site Map

Air Data Available for Monday, May 18, 2009

  • Real-Time air monitoring (Near Field Zone monitoring) - this type of air monitoring will determine if dust is migrating outside of the immediate work area so that additional dust control measures can be implemented before any dust can move off-site. This monitoring will consist of continuous, real-time dust monitoring upwind and downwind of the work zone during all phases of work with potential for significant release of dust (i.e., during soil excavation, backfill, waste placement, and cap installation.)  Real-Time monitoring provides immediate information on the amount of dust (not just lead) being generated.

Click on the links below to view graphs showing the real-time air monitoring data for May 18, 2009:    

                                     Working Hours                   Non-Working Hours        

 

  • Site perimeter monitoring - this kind of air monitoring consists of ambient air monitoring for lead using the high-volume sampler method, which is what has been used for the past 20 years at the Site. This sampling will determine if air lead is being emitted from the Site. Results with this type of monitoring are not immediate as the air collection filters have to be sent to a lab for analysis.  The sampler draws air over a filter and then the filter is analyzed for lead content. The volume of air that is drawn in is also recorded which gives us the results of micrograms (µg) of lead in cubic meters (m3) of air.   (Click here for a drawing showing the locations of the high volume air samplers.)

                                        Non-Working Hour Ambient Air Monitoring Result - result from weekend May 15, 2009 to May 18, 2009                                         

24-hour Ambient Air Monitoring Results - results from May 18, 2009     

 

 

(Click here to go back to the May 2009 calendar page.)

 

 

 

 

                

                 

 

 

 

 

 

 

Page Last Modified Tuesday March 02, 2010 02:45:56 PM

 

 

 

 

 

 

 

 

 

 

tel 570.383.9313 | email layers@advancedgeoservices.com

Send mail to
agc@advancedgeoservices.com with questions or comments about this web site.
Copyright © 2006 Advanced GeoServices