|
| |
Turbidity
Information Available for Friday, November 20, 2009
- A turbidity reading was collected at the off-site discharge point at
9:25 am. The turbidity result was 6.09 NTUs. The monthly total and
dissolved lead samples were also collected at the off-site discharge point. The dissolved lead result was below the laboratory detection
limit of 1.0
µg/L. The NPDES permit standard for maximum
dissolved lead for the Site is 650 ug/L. The total lead result was 1.3
µg/L.
There is not an NPDES standard for total lead.
(Click here to go back to the
November 2009 stormwater calendar page.)
Page Last Modified
Tuesday October 19, 2010 01:01:00 PM
|