Area G backfilled with low hazard soil stockpile material to existing grade within the footprint of the Containment (cap) Area - 10/1/08
Excavation of low hazard soil stockpile, looking south - 10/1/08
Excavation of low hazard soil stockpile, looking southwest - 10/1/08