View of south swale looking southeast from check dams (CD-15) in the south swale - 8/15/09
View of Site looking southwest from top of North Woods front slope - 8/3/09
View of sediment basin outlet structure including skimmer looking northeast from the emergency spillway - 8/3/09
View of sediment basin outlet structure including skimmerduring dewatering activities - 8/5/09
View of discharge channel looking southwest from sediment basin berm - 8/5/09
View of discharge channel during dewatering of sediment basin, looking toward outlet structure - 8/5/09
Stormwater management; pipeline into excavation Area B for pumping from the Containment Area, looking northwest - 8/6/09
Stormwater management modifications in excavation Area B, looking northwest - 8/6/09
Stormwater management modifications in excavation Area B; berm and check dam installation - 8/6/09
Stormwater management modification in excavation Area B; berm and check dam, looking southwest - 8/6/09
Stormwater management modifications in excavation Area B; berm and check dam, looking south - 8/6/09
Stabilization activities; jute mat installation along south swale - 8/6/09
Pipeline to excavation Area B from the Containment area for stormwater management - 8/6/09
Permanent access road construction; box-out along northern section - 8/4/09
North swale construction activities; check dam (CD-2) installation - 8/6/09
Flow within discharge channel during dewatering of the sediment basin at the discharge point - 8/5/09
Flow out of discharge pipe into discharge channel during dewatering activities - 8/5/09