Dewatering of Existing Sedimentation Basin - 7/1/08
Containment area berm construction southwest of the existing sedimentation basin - 7/2/08
Hydroseeding topsoil stockpile as part of erosion and sedimentation control measures - 7/3/08
Hydroseeded topsoil stockpile - 7/8/08
View of Site looking east from basin haul road - 7/3/08
Continued construction of new sedimentation basin - 7/8/08
Screening fill material from the hillside north of the existing basin - 7/7/08
Clearing area behind hillside north of existing sedimentation basin - 7/7/08
View of hillside north of the existing sedimentation basin - 7/9/08
View of hill side north of the existing sedimentation basin - 7/11/08
View of Site looking east from basin haul road - 7/11/08
View of Site looking west from area of guard trailer - 7/11/08
View of hillside and screening of fill material north of the existing sedimentation basin - 7/16/08
View of new sedimentation basin - 7/16/08
Cleared area for haul road into the North Woods - 7/22/08
Removal of end wall from existing sedimentation basin - 7/21/08
Installation of orifice plates on inlet structur ein new basin - 7/24/08
Installation of high visibility fencing around the large mine fissures in the North Woods - 7/22/08
Installation of skimmer in new sedimentation basin - 7/25/08
Vie wof hillside north of existing sedimentation basin - 7/28/08
View of Site looking west from guard trailer - 7/25/08
View of Site looking east from basin haul road - 7/25/08
Sealing grate on outlet structure in new sedimentation basin - 7/28/08
View of new sedimentation basin - 7/28/08