- Real-Time air monitoring (Near Field Zone monitoring) - this type of air
monitoring will determine if dust is migrating outside of the
immediate work area so that additional dust control measures can be
implemented before any dust can move off-site. This
monitoring will consist of continuous, real-time dust
monitoring upwind and downwind of the work zone during all
phases of work with potential for significant release of dust (i.e.,
during soil excavation, backfill, waste placement, and cap
installation.) Real-Time monitoring provides immediate
information on the amount of dust (not just lead) being generated.
The
real-time monitors will be moved around on a daily basis based on
the location of work activities for the day.
Click on the dates below to view graphs showing the real-time
air monitoring data for the week of May 26, 2008.
Monday, May 26, 2008 - There was no work performed and therefore, no
real time air data on May 26, 2008.
Tuesday, May
27, 2008 - No readings were taken during a thunderstorm for
safety reasons.
Wednesday, May 28, 2008
Thursday,
May 29, 2008
Friday, May 30, 2008
All results for the week of May 26, 2008 are below the established
action levels (level at which additional dust control measures
must be taken to prevent the possibility of elevated lead dust
levels).